Main content

News

Keel Laying of the World’s First LNG Hybrid Barge in Komárno

Rostock, 22. January 2014

The keel laying of the world’s first LNG Hybrid Barge took place at a ceremony held at the ”SAM Shipbuilding and Machinery“ shipyard in Komárno, Slovakia in the second week of the new year.

In the presence of representatives of the shipyard, AIDA Cruises, Becker Marine Systems and Hybrid Port Energy (a subsidiary of Becker Marine Systems and the barge shipping company), the laying of the keel was carried out following the tradition of placing a coin on the keel block prior to lowering the first section.

The start of cooperation between Becker Marine Systems and AIDA Cruises preceded this keel laying in the summer of 2012, with the aim of supplying environmentally friendly electricity to cruise ships during their layovers at port. The LNG Hybrid Barge currently under construction for this is equipped with 5 generators from Zeppelin Power Systems.  These produce a total power of 7.5 MW (50/60 Hz) but with zero emissions of sulphur oxides and soot particles. The generators will be the first marine classified LNG Caterpillar engines to be delivered to customers.

The LNG Hybrid Barge will be delivered in the summer of 2014 – just two years after the project began.

The 74.0 m long, 11.4 m wide and approx. 1.7 m draught barge will be stationed in Hamburg. The Port of Hamburg will thus be the first one in Europe to be offering an external, environmentally friendly and low-emission power supply for cruise ships. In addition, the LNG Hybrid Barge is equipped in such a way that other potential customers can be supplied with heat and electricity in the winter, thus further improving the barge’s “ecological footprint”.

amenue
02. March 2017

Mojib Latif enthuses AIDA guests with his dedication to climate protection

As part of the event series “Celebrities read,” the marine and climate protection expert Mojib Latif has been on board AIDAsol since February 26, 2017.

On the seven-day cruise around the Canary Islands, guests still have a chance to see Latif in exciting readings and talks ... [more]

21. February 2017

AIDA Cruises: start of construction of the first LNG cruise ship in the world at the Meyer Werft shipyard in Papenburg

On February 21, 2017, a new age dawned for the cruise shipping sector at the Meyer Werft shipyard in Papenburg. AIDA President Felix Eichhorn and Meyer Werft Director Bernard Meyer performed the symbolic first steel cutting for the world’s first cruise ship that can be run ... [more]

08. February 2017

AIDA Cruises extends portfolio of sustainable shore excursions

AIDA Cruises is extending its portfolio of sustainable shore excursions. Under the motto “Act now and preserve paradise,” guests can now book three new excursions in the Caribbean, including two from the Carnival Corporation brand, fathom, for socially responsible ... [more]