Main content

AIDAnova: First engine room module on Neptune shipyard finished

Rostock, 21. September 2017

oday, Thursday, September 21, 2017, an AIDAnova module has been released into the water for the first time at the Neptun shipyard in Rostock, which belongs to the Meyer Group. This is the first of two floating parts, so-called Floating Engine Room Units (FERU), which was placed onto the Warnow river with a special lowering device. The complex module stretching over 120 meters long and 42 meters wide, as well as three decks high, is carrying the four dual-fuel engines by Caterpillar and hence the heart of AIDAnova.

AIDAnova is the first cruise ship in the world, which – starting in the fall of 2018 – will be able to operate both in ports and at sea with the most environmentally friendly and lowest-emission fossil fuel thanks to the operation of four dual-fuel engines. By using LNG, emissions of fine dust and sulfur oxides are almost completely prevented and emissions of nitrogen oxides and CO2 are permanently reduced.

The shipment of the first AIDAnova module from Rostock to the Meyer Werft shipyard in Papenburg is scheduled to take place from September 25–28, 2017, depending on the weather conditions. It’s time to set sail as planned next Monday, September 25, 2017, at 10.00 am at the Neptun shipyard in Rostock with a course set for the Kiel Fjord. In the early morning hours of September 26, 2017, around 7.00 am, the floating part will begin the passage through the Kiel Canal from Kiel to Brunsbüttel. After a twelve-hour journey, the floating module will arrive in Brunsbüttel on September 26, 2017, at around 7 pm. From Borkum, it will carry on towards Emden with an expected arrival time of 9.00 am on September 27, 2017. The last passage will take the part from Emden to Papenburg, where the four dual-fuel engines will arrive around 7 pm on September 28, 2017.

With the construction of the engine room modules at the Neptun shipyard in Rostock and the investment in Caterpillar engines, AIDA Cruises not only strengthens regional cooperation but is also a key driver of the local economy. More than 500 shipyard workers and 500 external employees from other service providers are currently employed at the Neptun shipyard. In addition, there are 120 Caterpillar employees, who are assembling the engines.

Bookings are now available
Starting in December 2018, AIDAnova will offer trips around the Canary Islands. Before the start of the Canary season, the new ship will make a stop in Hamburg. On December 2, 2018, the new ship will visit the Hanseatic City on the Elbe. From here, it will set off towards Gran Canaria.

All AIDAnova cruises can be booked at travel agencies, the AIDA Customer Center at +49 (0)381/202 707 07 or at www.aida.de. More information and impressions are available at aida.de/genaumeurlaub.

27. May 2014

Prize-winning: AIDA cookbook receives Gourmand World Cookbook Award in Beijing

The prestigious Gourmand World Cookbook Awards were held in Beijing on May 20 and 21, 2014. Having already qualified in advance as the best German travel cookbook, “Das marktfrische AIDA Kochbuch” managed to take third place at the world finals.During the course of 144 pages, ... [more]

21. May 2014

AIDA Cruises increases arrivals in Hamburg

In 2015 the cruise line AIDA Cruises will visit the Hanseatic City of Hamburg a total of 55 times with five ships. AIDAbella will be new to Hamburg. The amount of ship arrivals will increase from 49 to 55. From May 2nd to October 13th, 2015, AIDAbella will visit the Hanseatic ... [more]

06. May 2014

AIDA Cruises: Dr. Ali Arnaout is the new CFO & Senior Vice President Business Development

Dr. Ali Arnaout (45) joined the AIDA Cruises executive management team on May 5, 2014 as the new CFO & SVP Business Development. He therefore succeeds Paul Soulsby as CFO, who was appointed Senior Vice President Shared Services for the Costa Group in Genoa in January 2014. ... [more]

03. May 2014
AIDAprima has successfully touched water

AIDAprima has successfully touched water

On May 3, 2014, at 2 p.m. local time, the dry-dock gates opened for AIDAprima for the first time at the Tategami Plant of Nagasaki Shipyard of Mitsubishi Heavy Industries Ltd. (MHI) in Nagasaki, Japan. The cruise ship has touched water and has successfully demonstrated its ... [more]

Pressekontakt

 

Hansjörg Kunze
Vice President Communication & Sustainability

E-Mail: presse@aida.de