Main content

News

AIDAnova: First engine room module on Neptune shipyard finished

Rostock, 21. September 2017

oday, Thursday, September 21, 2017, an AIDAnova module has been released into the water for the first time at the Neptun shipyard in Rostock, which belongs to the Meyer Group. This is the first of two floating parts, so-called Floating Engine Room Units (FERU), which was placed onto the Warnow river with a special lowering device. The complex module stretching over 120 meters long and 42 meters wide, as well as three decks high, is carrying the four dual-fuel engines by Caterpillar and hence the heart of AIDAnova.

AIDAnova is the first cruise ship in the world, which – starting in the fall of 2018 – will be able to operate both in ports and at sea with the most environmentally friendly and lowest-emission fossil fuel thanks to the operation of four dual-fuel engines. By using LNG, emissions of fine dust and sulfur oxides are almost completely prevented and emissions of nitrogen oxides and CO2 are permanently reduced.

The shipment of the first AIDAnova module from Rostock to the Meyer Werft shipyard in Papenburg is scheduled to take place from September 25–28, 2017, depending on the weather conditions. It’s time to set sail as planned next Monday, September 25, 2017, at 10.00 am at the Neptun shipyard in Rostock with a course set for the Kiel Fjord. In the early morning hours of September 26, 2017, around 7.00 am, the floating part will begin the passage through the Kiel Canal from Kiel to Brunsbüttel. After a twelve-hour journey, the floating module will arrive in Brunsbüttel on September 26, 2017, at around 7 pm. From Borkum, it will carry on towards Emden with an expected arrival time of 9.00 am on September 27, 2017. The last passage will take the part from Emden to Papenburg, where the four dual-fuel engines will arrive around 7 pm on September 28, 2017.

With the construction of the engine room modules at the Neptun shipyard in Rostock and the investment in Caterpillar engines, AIDA Cruises not only strengthens regional cooperation but is also a key driver of the local economy. More than 500 shipyard workers and 500 external employees from other service providers are currently employed at the Neptun shipyard. In addition, there are 120 Caterpillar employees, who are assembling the engines.

Bookings are now available
Starting in December 2018, AIDAnova will offer trips around the Canary Islands. Before the start of the Canary season, the new ship will make a stop in Hamburg. On December 2, 2018, the new ship will visit the Hanseatic City on the Elbe. From here, it will set off towards Gran Canaria.

All AIDAnova cruises can be booked at travel agencies, the AIDA Customer Center at +49 (0)381/202 707 07 or at www.aida.de. More information and impressions are available at aida.de/genaumeurlaub.

amenue
11. January 2016

AIDA offers service for easier visa applications

Starting now, the cruise company AIDA Cruises is offering its guests a new service that will assist them with visa formalities. To this end, AIDA is teaming up with the market leader for international visas and passports, CIBT VisumCentrale. Guests that have booked an AIDA ... [more]

06. January 2016

AIDA Cruises achieves positive sustainability result in 2015

AIDA Cruises, a pioneer in the German cruise industry when it comes to sustainability, successfully continued in its commitment to reduce emissions in 2015.“We have once again achieved important milestones in environmental protection. Since 2015, AIDAsol is the first cruise ship ... [more]

04. January 2016

AIDA Cruises: Dr. Gerlinde Leichtfried is new Senior Vice President Marketing & E-Commerce

Dr. Gerlinde Leichtfried (39) has been reinforcing the AIDA Cruises leadership team as of January 1, 2016 in her new role as Senior Vice President Marketing & E-Commerce. In this position the native Austrian will be responsible for all brand and product communication, ... [more]